About Dawnice C&I Energy Storage

Dawnice C&I energy storage systems are professional-grade industrial solutions designed for high-efficiency energy management in commercial and large-scale operations.

Built with premium LiFePO₄ cells and industrial-grade enclosures for durability and safety, our systems utilize advanced battery management and power conversion technology to reliably store and dispatch energy while minimizing degradation and maximizing cycle life.

Key features include high-capacity storage (from 86kWh to over 2MWh models), automated peak shaving and load shifting functions, high-efficiency operation, easy maintenance, and compliance with international safety standards (UN38.3, IEC62619, CE, UL1973).

Ideal for factories, EV charging stations, data centers, and microgrids, Dawnice systems help businesses reduce electricity costs, improve grid stability, and enhance energy efficiency.

About Us
150 + Countries Served
15 + Years Experience
2000 + Projects Completed
50 + Technical Experts

Dawnice's Factory

Dawnice's factory is equipped with state-of-the-art automated production lines — from LiFePO₄ cell manufacturing and battery rack assembly to full system integration — committed to delivering energy storage products that meet the highest international standards (UN38.3, IEC62619, CE, UL1973, ISO9001).

About Us

Automated Cell Line

State-of-the-art LiFePO₄ cell manufacturing with advanced automation.

About Us

Battery Assembly

Precision rack and cabinet assembly by certified technicians.

About Us

System Testing

Rigorous cell, pack, and system-level quality control.

About Us

R&D Engineering

In-house engineering team driving continuous innovation.

Our Strategic Partners

We have established in-depth strategic cooperation with global mainstream inverter brands such as Deye, Sungrow, Goodwe, Growatt, SMA and KSTAR, and have cooperative relations with top-tier lithium cell suppliers...

  • About Us
  • About Us
  • About Us
  • About Us
  • About Us
  • About Us
  • About Us

Frequently Asked Questions

Find answers to common questions about our home and commercial energy storage products, services, and support.

What types of energy storage products do you offer?

+

We offer a complete range of lithium battery energy storage solutions — including residential (home) systems from 5kWh to 30kWh, and commercial & industrial (C&I) systems from 86kWh to 2MWh. Our lineup covers all-in-one ESS, outdoor cabinets, high-voltage racks, containerized systems, and hybrid inverters.

How long is the typical delivery time?

+

Delivery times vary by product type and order volume. Standard residential systems are typically ready within 15–30 days, while customized C&I and containerized solutions may require 30–60 days, including production, testing, and export packaging.

Do you provide installation and commissioning support?

+

Yes,We offer comprehensive installation guidance, on-site commissioning, and operator training. Our technical team provides remote support worldwide and can dispatch engineers for large C&I projects, ensuring smooth startup and optimal performance.

What warranty do you offer?

+

All our energy storage systems come with a comprehensive warranty. Residential systems typically include a 10-year warranty, while C&I systems offer a 5+5 year warranty (5-year standard + 5-year extended), covering manufacturing defects and capacity degradation.

Can you customize energy storage systems for specific needs?

+

Absolutely. Our engineering team works closely with clients to customize capacity, voltage, inverter compatibility, enclosure type, and EMS features — whether for a home backup, a factory peak-shaving project, or an off-grid microgrid.

How do you ensure product quality and safety?

+

We implement rigorous quality control throughout manufacturing — from cell incoming inspection and pack assembly to full system burn-in testing. Every unit adheres to international safety standards including UN38.3, IEC62619, CE, and UL1973.

What certifications do your energy storage products have?

+

Our products hold multiple international certifications — UN38.3 (transport safety), IEC62619 (industrial battery safety), CE (EU market compliance), UL1973 (US storage safety), and ISO9001 (quality management) — ensuring global market access.

How can I request a quote or BOM?

+

You can submit an inquiry through our website contact form, email us directly, or contact our sales team. Please provide your application scenario (home or C&I), required capacity, voltage, and local grid standards for an accurate BOM quotation.