All-in-One ESS (5)
Integrated commercial & industrial energy storage systems with battery, PCS, and EMS in a single cabinet.
-
Dawnice BS07-265-ES-X 125kW/265kWh All-in-One C&I LiFePO4 Energy Storage
The BS07-265-ES-X (Nezha Series) is a 125kW/265kWh all-in-one commercial and industrial energy storage system designed for peak shaving and load management. Built with 3.2V 314Ah LiFePO₄ (CTP) cells, it delivers ≥8,000 cycle life, ≥15-year design life, and a 5+5 year warranty, certified to UN38.3, IEC62619,…
-
Dawnice Honey 260kWh Liquid-Cooled All-in-One C&I LiFePO4 Energy Storage
The Honey WD-ECF260S is a Dawnice 260kWh liquid-cooled all-in-one commercial and industrial energy storage cabinet. Liquid cooling delivers superior temperature uniformity and longer cycle life, suitable for high-power-density commercial and industrial deployment. Key Specifications at a Glance: 260kWh Capacity | Liquid Cooling | All-in-One Design…
-
Dawnice 125kW/265kWh PV-Storage-Genset Hybrid C&I LiFePO4 Energy Storage
The BS07-265-ES-G (Nezha Series) is a 125kW/265kWh PV-Storage-Genset hybrid all-in-one system that seamlessly couples solar, diesel generator, and grid, supporting black start for mining, island, and off-grid remote scenarios. Key Specifications at a Glance: 125kW/265kWh | 1P264S | DC 844.8V | 150kVA Isolation Transformer |…
-
Dawnice 100kW/215kWh Liquid-Cooled All-in-One C&I LiFePO4 Energy Storage
The 100kW/215kWh Liquid-Cooled All-in-One Cabinet is a Dawnice liquid-cooled commercial and industrial energy storage system with integrated battery + PCS, liquid cooling, suitable for rapid deployment in small and medium commercial applications. Key Specifications at a Glance: 100kW | 215kWh | Liquid Cooling | All-in-One…
-
Dawnice 500kWh All-in-One Cabinet C&I LiFePO4 Energy Storage System
The 500kWh All-in-One Cabinet is a Dawnice large-capacity commercial and industrial energy storage cabinet suitable for park-level centralized co-located storage. Key Specifications at a Glance: 500kWh | All-in-One | Commercial-Grade | 5+5 Year Warranty Fire suppression + BMS protection. Q: Can it be paralleled? A:…