Dawnice BESS - Dawnice BS07-265-ES-X 125kW/265kWh All-in-One C&I LiFePO4 Energy Storage - Bs07 265 Es X 125Kw 265Kwh All In O...

Dawnice BS07-265-ES-X 125kW/265kWh All-in-One C&I LiFePO4 Energy Storage

Dawnice BS07-265-ES-X 125kW/265kWh all-in-one C&I energy storage system delivers high-power LiFePO4 battery storage with integrated PCS, BMS, and EMS in one compact cabinet for commercial & industrial applications. All-in-one design enables plug-and-play deployment, peak-shaving, demand management, and reliable backup power for global C&I users seeking to reduce electricity costs.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The BS07-265-ES-X (Nezha Series) is a 125kW/265kWh all-in-one commercial and industrial energy storage system designed for peak shaving and load management. Built with 3.2V 314Ah LiFePO₄ (CTP) cells, it delivers ≥8,000 cycle life, ≥15-year design life, and a 5+5 year warranty, certified to UN38.3, IEC62619, and CE standards.

Key Specifications at a Glance: 265.26kWh Capacity | 238.74kWh Usable (90% DOD) | DC 844.8V | 125kW Rated (Max 138kW) | IP54 / C4 | Aerosol + Water Fire Suppression

Key Features

  • Peak Shaving: Charge during off-peak hours and discharge during peak hours to significantly reduce electricity costs.
  • 314Ah CTP High Density: Cell-to-pack technology delivers higher energy density in the same footprint.
  • Zero-Clearance Deployment: Front-in / rear-out airflow design supports back-to-back installation.
  • Multi-Layer Safety: Cluster-level aerosol + cabin-level water mist dual fire suppression with real-time battery monitoring.
  • Smart Thermal Management: PCS waste heat recovery reduces auxiliary energy consumption.

Specifications

Model BS07-265-ES-X
Cell Type LiFePO₄ (Lithium Iron Phosphate)
Configuration 3.2V 314Ah / 1P264S
Rated Battery Voltage DC 844.8V
Operating Voltage Range DC 739.2~950.4V
Rated Energy 265.26kWh
Usable Energy (90% DOD) 238.74kWh
Max Charge/Discharge Current 157A
Cycle Life ≥8,000 cycles (25°C, 0.5C, 90% DOD, 70% EOL)
Warranty 5+5 years
Cumulative Discharge Energy 426.0MWh
AC Rated Power 125kW (Max 138kW)
AC Voltage / Standard 400V, 3W+N+PE, 50/60Hz
Power Factor 0.99 / -1~1
THDi <2% (rated power)
Max Efficiency 98.5%
Dimensions (W×D×H) 1095×1520×2395mm
Weight 2680kg
Protection Rating IP54, C4 (C5 optional)
Operating Temperature -30~55°C (derating above 45°C)
Noise ≤75dB (1m)
Cooling Smart Air Cooling
Fire Suppression Aerosol + Water Mist
Communication CAN / RS485

Certifications & Safety

UN38.3 / MSDS / IEC62619(CB) / IEC63056(CB) / IEC62040-1(CB) / CE-EMC / IEC62477-1 / IEC60529. Three-layer protection architecture, real-time fault diagnosis, multiple thermal runaway protections. Dual fire suppression with <500ms response.

Applications

  • Industrial park peak shaving and factory load management
  • Commercial building demand charge optimization
  • Distributed solar + storage and demand management

Dawnice BS07-265-ES-X 125kW C&I LiFePO4 Energy Storage System - Commercial Application Scene

Dawnice BS07-265-ES-X 125kW C&I LiFePO4 Energy Storage System - Main Product View
Dawnice BS07-265-ES-X 125kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice BS07-265-ES-X 125kW C&I LiFePO4 Energy Storage System - Official Internal Structure Diagram
Dawnice BS07-265-ES-X 125kW C&I LiFePO4 Energy Storage System - Front Angle Product Photography
Dawnice BS07-265-ES-X 125kW C&I LiFePO4 Energy Storage System - Solar Farm Integration Application
Dawnice BS07-265-ES-X 125kW C&I LiFePO4 Energy Storage System - Commercial Building Installation
Dawnice BS07-265-ES-X 125kW C&I LiFePO4 Energy Storage System - Right Angle Product Photography
Dawnice BS07-265-ES-X 125kW C&I LiFePO4 Energy Storage System - Close-up Detail of Components
Dawnice BS07-265-ES-X 125kW C&I LiFePO4 Energy Storage System - 225kWh Capacity Configuration Detail
Dawnice BS07-265-ES-X 125kW C&I LiFePO4 Energy Storage System - Certification and Safety Compliance

FAQ

Q: Can it be paralleled for capacity expansion?

A: Yes, multiple units can be paralleled for custom capacity (from 265kWh upwards).

Q: Does it include PCS?

A: Yes, it includes a built-in 125kW PCS and isolation transformer.

Q: Which electricity tariff is most suitable?

A: It is most cost-effective for commercial and industrial tariffs with significant peak-valley price differences.

Q: What is the warranty?

A: 5+5 years — free replacement in the first 5 years plus extended coverage.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.