Dawnice BESS - Dawnice Honey 260kWh Liquid-Cooled All-in-One C&I LiFePO4 Energy Storage - Honey Wd Ecf260S 260Kwh Liquid Cool...

Dawnice Honey 260kWh Liquid-Cooled All-in-One C&I LiFePO4 Energy Storage

Dawnice Honey WD-ECF260S 260kWh liquid-cooled all-in-one energy storage system delivers high-efficiency LiFePO4 battery storage with integrated liquid cooling in a compact cabinet for commercial & industrial applications. All-in-one design integrates battery, PCS, BMS, and thermal management for plug-and-play deployment, extended cycle life, and reliable performance for global C&I peak-shaving and solar projects.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The Honey WD-ECF260S is a Dawnice 260kWh liquid-cooled all-in-one commercial and industrial energy storage cabinet. Liquid cooling delivers superior temperature uniformity and longer cycle life, suitable for high-power-density commercial and industrial deployment.

Key Specifications at a Glance: 260kWh Capacity | Liquid Cooling | All-in-One Design | 5+5 Year Warranty

Key Features

  • High-Efficiency Liquid Cooling: Superior temperature uniformity compared to air cooling, extending battery life.
  • All-in-One Design: Battery + PCS + EMS integrated for plug-and-play deployment.
  • High Energy Density: Higher capacity in the same footprint.
  • Smart Management: EMS real-time monitoring and cloud-based O&M.

Specifications

Model Honey WD-ECF260S
Cell Type LiFePO₄
Rated Energy 260kWh
Cooling Liquid Cooling
Integration Battery + PCS + EMS
Warranty 5+5 years
Certifications UN38.3 / IEC62619 / CE (per official Datasheet)
Protection Rating Outdoor-grade (IP54 level)

Certifications & Safety

Liquid cooling thermal management + BMS multi-layer protection. Module-level fire suppression (per Datasheet). Certified to UN38.3 / IEC62619 / CE / UL series.

Applications

  • Commercial and industrial park energy storage and factory peak shaving
  • Charging station / data center co-located storage
  • High-density indoor and outdoor deployment

Dawnice Honey 260kW C&I LiFePO4 Energy Storage System - Main Product View

Dawnice Honey 260kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice Honey 260kW C&I LiFePO4 Energy Storage System - Official Internal Structure Diagram
Dawnice Honey 260kW C&I LiFePO4 Energy Storage System - Front Angle Product Photography
Dawnice Honey 260kW C&I LiFePO4 Energy Storage System - Product Detail Image

FAQ

Q: What are the advantages of liquid cooling over air cooling?

A: Smaller temperature difference, longer life, smaller footprint, and lower noise.

Q: Can capacity be expanded?

A: Supports multi-cabinet parallel connection.

Q: Can it be installed outdoors?

A: Yes, suitable for outdoor installation with high protection rating.

Q: What is the PCS power?

A: PCS is configured per project (see Datasheet for details).

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.