Dawnice 500kWh All-in-One Cabinet C&I LiFePO4 Energy Storage System
The 500kWh All-in-One Cabinet is a Dawnice large-capacity commercial and industrial energy storage cabinet suitable for park-level centralized co-located storage.
Key Specifications at a Glance: 500kWh | All-in-One | Commercial-Grade | 5+5 Year Warranty
Key Features
- Large Capacity All-in-One: 500kWh per cabinet.
- Integrated Design: Battery + PCS + EMS.
- Rapid Deployment: Standard cabinet.
- Smart Management: Cloud O&M.
Specifications
| Model | 500kWh All-in-One Cabinet |
|---|---|
| Rated Energy | 500kWh |
| Cell | LiFePO₄ |
| System | All-in-One |
| Warranty | 5+5 years |
| Certifications | Per official Datasheet |
Certifications & Safety
Fire suppression + BMS protection.
Applications
- Park centralized co-located storage
- Large commercial peak shaving
FAQ
Q: Can it be paralleled?
A: Supports multi-cabinet parallel.
Order & Support
For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.
Applications
Factory & Industrial Parks
Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.
Commercial Buildings & Data Centers
Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.
EV Charging Stations
Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.
Residential & Community
Store solar energy for self-consumption; provide backup power during outages and lower utility bills.
Remote & Off-Grid Microgrids
Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.
Renewable Energy Integration
Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.