Dawnice BESS - Dawnice 1000kWh Liquid-Cooled Container C&I LiFePO4 Energy Storage System - 1000Kwh Liquid Cooled Container Es...

Dawnice 1000kWh Liquid-Cooled Container C&I LiFePO4 Energy Storage System

Dawnice 1000kWh liquid-cooled container energy storage system delivers high-efficiency LiFePO4 battery storage for commercial & industrial applications. Integrated liquid cooling ensures uniform temperature, extended cycle life, and rapid outdoor deployment for global C&I projects.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The 1000–2000kWh Liquid-Cooled Large Storage is a Dawnice liquid-cooled container energy storage system supporting 1000kWh/2000kWh multi-cabinet parallel, designed for large energy storage stations.

Key Specifications at a Glance: 1000–2000kWh | Liquid Cooling | Multi-Cabinet Parallel | 5+5 Year Warranty

Key Features

  • Liquid-Cooled Large Storage: Large-capacity liquid-cooled container.
  • Multi-Cabinet Parallel: Expand to tens of MWh.
  • High-Efficiency Cooling: Liquid cooling thermal management.
  • Smart EMS: Station-level scheduling.

Specifications

Model 1000kWh Liquid-Cooled Large Storage
Rated Energy 1000–2000kWh
Cooling Liquid Cooling
Cell LiFePO₄
Warranty 5+5 years
Certifications Per official Datasheet

Certifications & Safety

Fire suppression + BMS protection.

Applications

  • Large energy storage stations
  • Grid-side peak shaving
Dawnice 1000Kwh Liquid Cooled Ess 1000kW C&I LiFePO4 Energy Storage System - Commercial Application Scene
Dawnice 1000Kwh Liquid Cooled Ess 1000kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice 1000Kwh Liquid Cooled Ess 1000kW C&I LiFePO4 Energy Storage System - Official Internal Structure Diagram
Dawnice 1000Kwh Liquid Cooled Ess 1000kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice 1000Kwh Liquid Cooled Ess 1000kW C&I LiFePO4 Energy Storage System - Product Detail Image

FAQ

Q: What is the max expansion?

A: Multi-cabinet parallel to tens of MWh.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.