Dawnice BESS - Dawnice BS09-225-D 225kWh Outdoor C&I LiFePO4 Energy Storage Cabinet - Bs09 225 D 225Kwh Outdoor Energy Storag...

Dawnice BS09-225-D 225kWh Outdoor C&I LiFePO4 Energy Storage Cabinet

Dawnice BS09-225-D 225kWh outdoor energy storage cabinet delivers reliable LiFePO4 battery storage in a weatherproof outdoor cabinet for commercial & industrial applications. IP54/IP65 protection enables direct outdoor installation, while integrated BMS and PCS ensure safe operation, peak-shaving, demand management, and backup power for global C&I users.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The BS09-225-D is a 225kWh DC-side outdoor energy storage cabinet from the Dawnice LOONG POWER 4.0 series. Featuring 314Ah LiFePO₄ cells, ≥8,000 cycle life, 5+5 year warranty, IP54 / C3 outdoor protection, and an automatic fire suppression system.

Key Specifications at a Glance: 225.07kWh Capacity | 202.56kWh Usable | 716.8V | 1P224S | 157A | Up to 10 Units Parallel | IP54 / C3

Key Features

  • Smart Climate Control: Intelligent climate control adapted to various application scenarios.
  • High Efficiency Conversion: Charge/discharge conversion and system efficiency ≥90%.
  • Fire Suppression System: Automatic fire alarm + automatic fire extinguishing system.
  • Stable Operation: Comprehensive communication and monitoring for long-term continuous stable operation.

Specifications

Model BS09-225-D
Cell Type LiFePO₄
Rated Voltage 716.8V
Configuration 1P224S
Capacity 314Ah
Rated Energy 225.07kWh
Usable Energy (90% DOD) 202.56kWh
Max Charge/Discharge Current 157A
Voltage Range 627.2~806.4V
Parallel Expansion Up to 10 units
Cycle Life ≥8,000 cycles (25°C, 0.5C, 90% DOD)
Warranty 5+5 years
Cumulative Discharge Energy 361.4MWh
Cooling Smart Air Cooling
Noise ≤75dB (1m)
Dimensions (W×D×H) 1250×1413×2385mm
Weight 2534kg
Protection Rating IP54, C3 (C5 optional)
Communication CAN / RS485

Certifications & Safety

MSDS / UN38.3 / IEC62619 / IEC61000 / IEC62477. Automatic fire alarm + automatic fire extinguishing system. BMS real-time monitoring with over-current, over-temperature, and short-circuit protection.

Applications

  • Commercial and industrial park energy storage and demand management
  • Solar + storage and peak shaving
  • Distributed microgrids

Dawnice BS09-225-D 225kW C&I LiFePO4 Energy Storage System - Main Product View

Dawnice BS09-225-D 225kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice BS09-225-D 225kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice BS09-225-D 225kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice BS09-225-D 225kW C&I LiFePO4 Energy Storage System - Close-up Detail of Components
Dawnice BS09-225-D 225kW C&I LiFePO4 Energy Storage System - 225kWh Capacity Configuration Detail
Dawnice BS09-225-D 225kW C&I LiFePO4 Energy Storage System - Certification and Safety Compliance

FAQ

Q: Does outdoor installation require a foundation?

A: A level reinforced concrete foundation is required. Installation guidance is provided by the manufacturer.

Q: How large can it be paralleled?

A: Up to 10 units can be paralleled, expanding capacity to 2MWh level.

Q: Can it operate in low temperatures?

A: Operating range -30~55°C, with automatic derating above 45°C.

Q: What fire suppression is included?

A: Standard automatic fire alarm + automatic fire extinguishing.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.