Dawnice BESS - Dawnice 500kW/1.045MWh 20GP Containerized C&I LiFePO4 Energy Storage System - Ess500 1045 500Kw 1.045Mwh Conta...

Dawnice 500kW/1.045MWh 20GP Containerized C&I LiFePO4 Energy Storage System

Dawnice ESS500-1045 500kW/1.045MWh containerized energy storage system delivers high-capacity LiFePO4 battery storage in a standard 20GP shipping container for commercial & industrial applications. Integrated PCS, BMS, and thermal management enable rapid outdoor deployment, high-efficiency operation, and scalable capacity for global utility-scale and C&I energy storage projects.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The ESS500-1045 is a Dawnice 500kW/1.045MWh containerized energy storage system (20GP). Built with 314Ah LiFePO₄ cells, smart air cooling, and FM200/NOVEC1230 fire suppression, it supports grid-tied/off-grid switching and is ideal for park-level and microgrid-level energy storage.

Key Specifications at a Glance: 500kW | 1.045MWh | 20GP | 665.6V/5P208S | ≥8,000 Cycles | IP54 / C5

Key Features

  • Flexible Multi-Mode: Multiple operating modes can be flexibly configured.
  • Real-Time Status Monitoring: System status monitored online in real time.
  • Smart Thermal Management: BMS + integrated thermal management.
  • Universal Power Input: Load / battery / grid / DG can be connected simultaneously.
  • Thermal Isolation Safety: Electrical compartment and battery compartment separated to prevent thermal propagation.
  • Rapid Deployment: Integrated design for easy transport and installation.

Specifications

Model ESS500-1045
Rated Power 500kW
Rated Voltage 400V (AC output 320V-460V)
Rated Current 785A
Battery Configuration 665.6V / 5P208S
Rated Energy 1.045MWh
Operating Voltage Range 582.4~748.8V
Cell 3.2V / 314Ah
Max Charge/Discharge Rate 0.5C@25°C
Cycle Life ≥8,000
Container Size 20GP
Net Weight 21,000kg
Operating Temperature 0~+45°C
Humidity 0~95% (non-condensing)
Protection Rating IP54
Noise <75dB
Altitude 3,000m
Cooling Smart Air Cooling
Fire Suppression FM200 / NOVEC1230
Display Touch LCD + Cloud Platform
EMS Communication RS485 / TCP/IP
Corrosion Protection C5
Isolation Transformer 315/400V
Grid-Tied/Off-Grid Switching Supported

Certifications & Safety

Fire suppression: FM200 / NOVEC1230 automatic extinguishing. Electrical compartment / battery compartment thermal isolation. Certified to UN38.3 / IEC62619 / IEC62477.

Applications

  • Park-level energy storage stations and centralized commercial storage
  • Microgrids and grid-tied/off-grid switching scenarios
  • Renewable energy grid-connected co-located storage

Dawnice Ess500 1045 500kW C&I LiFePO4 Energy Storage System - Product Detail Image

Dawnice Ess500 1045 500kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice Ess500 1045 500kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice Ess500 1045 500kW C&I LiFePO4 Energy Storage System - Product Detail Image

FAQ

Q: Is 20GP transport convenient?

A: Standard container shipping with mature global logistics.

Q: Does it include PCS?

A: Yes, includes 500kW PCS and isolation transformer.

Q: Can it be paralleled for expansion?

A: Supports multi-unit parallel expansion to MW level.

Q: What fire suppression is included?

A: FM200/NOVEC1230 gas fire suppression.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.