Dawnice BESS - Dawnice 500kWh All-in-One Cabinet C&I LiFePO4 Energy Storage System - 500Kwh All In One Cabinet Ess 2

Dawnice 500kWh All-in-One Cabinet C&I LiFePO4 Energy Storage System

Dawnice 500kWh All-in-One Cabinet energy storage system integrates LiFePO4 battery, PCS, BMS, and thermal management in a compact cabinet for commercial & industrial applications. Plug-and-play design enables fast deployment, small footprint, and flexible expansion for global C&I energy projects.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The 500kWh All-in-One Cabinet is a Dawnice large-capacity commercial and industrial energy storage cabinet suitable for park-level centralized co-located storage.

Key Specifications at a Glance: 500kWh | All-in-One | Commercial-Grade | 5+5 Year Warranty

Key Features

  • Large Capacity All-in-One: 500kWh per cabinet.
  • Integrated Design: Battery + PCS + EMS.
  • Rapid Deployment: Standard cabinet.
  • Smart Management: Cloud O&M.

Specifications

Model 500kWh All-in-One Cabinet
Rated Energy 500kWh
Cell LiFePO₄
System All-in-One
Warranty 5+5 years
Certifications Per official Datasheet

Certifications & Safety

Fire suppression + BMS protection.

Applications

  • Park centralized co-located storage
  • Large commercial peak shaving

Dawnice 500Kwh All In One Cabinet 500kW C&I LiFePO4 Energy Storage System - Internal Structure and Components

Dawnice 500Kwh All In One Cabinet 500kW C&I LiFePO4 Energy Storage System - Main Product View
Dawnice 500Kwh All In One Cabinet 500kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice 500Kwh All In One Cabinet 500kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice 500Kwh All In One Cabinet 500kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice 500Kwh All In One Cabinet 500kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice 500Kwh All In One Cabinet 500kW C&I LiFePO4 Energy Storage System - Product Detail Image

FAQ

Q: Can it be paralleled?

A: Supports multi-cabinet parallel.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.