Dawnice BESS - Dawnice BS09-112-D-P 112kWh Outdoor C&I LiFePO4 Energy Storage System - Bs09 112 D P 112Kwh Outdoor Energy Sto...

Dawnice BS09-112-D-P 112kWh Outdoor C&I LiFePO4 Energy Storage System

Dawnice BS09-112-D-P 112kWh outdoor energy storage system delivers reliable LiFePO4 battery storage in a weatherproof cabinet for commercial & industrial applications. IP54/IP65 protection enables direct outdoor installation, while integrated BMS and PCS ensure safe operation, peak-shaving, demand management, and backup power for global C&I users.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The BS09-112-D-P (LOONG POWER 4.0) is a Dawnice 112kWh outdoor energy storage system with triple safety monitoring, plug-and-play inverter compatibility, display screen, and fault diagnosis, suitable for small and medium commercial and industrial applications.

Key Specifications at a Glance: 112.53kWh Capacity | 101.28kWh Usable | 358.4V | 1P112S | IP54 / C3 | 180.7MWh Cumulative

Key Features

  • Triple Safety Monitoring: Smoke/temperature real-time detection, automatic fire alarm within 1 second.
  • Plug-and-Play Inverter Compatibility: Auto-identification, ≥8,000 cycle certified.
  • Multi-Status Visual Indication: Instant identification of operating status.
  • Smart Diagnosis: Real-time parameter visualization + integrated fault diagnosis.

Specifications

Model BS09-112-D-P
Cell Type LiFePO₄
Rated Energy 112.53kWh
Usable Energy (90% DOD) 101.28kWh
Rated Voltage 358.4V
Voltage Range 313.6~403.2V
Configuration 1P112S
Charge/Discharge Current 157A
Cycle Life ≥8,000 cycles
Warranty 5+5 years
Cumulative Discharge Energy 180.7MWh
Dimensions (W×D×H) 915×1287×2085mm
Weight 1342kg
Protection IP54, C3 (C5 optional)
Cooling Smart Air Cooling
Communication CAN / RS485

Certifications & Safety

MSDS / UN38.3 / IEC62619 / IEC61000 / IEC62477. Smoke/temperature sensor + automatic fire alarm.

Applications

  • Small and medium commercial peak shaving
  • Charging station co-located storage, shop backup power

Dawnice BS09-112-D-P 112kW C&I LiFePO4 Energy Storage System - Main Product View

Dawnice BS09-112-D-P 112kW C&I LiFePO4 Energy Storage System - Commercial Application Scene
Dawnice BS09-112-D-P 112kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice BS09-112-D-P 112kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice BS09-112-D-P 112kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice BS09-112-D-P 112kW C&I LiFePO4 Energy Storage System - Product Detail Image

Dawnice BS09-112-D-P 112kW C&I LiFePO4 Energy Storage System - Product Detail Image

FAQ

Q: Is a grid-tied inverter required?

A: Compatible with mainstream inverters, plug-and-play.

Q: Can it be installed outdoors?

A: Yes, IP54 rated.

Q: Can capacity be expanded?

A: Supports parallel expansion.

Q: What fire suppression is included?

A: Automatic fire alarm + fire suppression.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.