Dawnice BESS - Dawnice EnerFlex-2.0 192kWh HV Indoor C&I LiFePO4 Energy Storage Battery - Bs09 192 R Enerflex 2.0 Hv Indoor E...

Dawnice EnerFlex-2.0 192kWh HV Indoor C&I LiFePO4 Energy Storage Battery

Dawnice BS09-192-R EnerFlex-2.0 192kWh HV indoor energy storage battery delivers high-voltage LiFePO4 battery storage in a compact indoor cabinet for commercial & industrial applications. High-voltage platform reduces line loss and improves system efficiency, while modular design enables easy installation, flexible expansion, and reliable performance for global C&I indoor energy storage projects.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The BS09-192-R (EnerFlex-2.0) is a Dawnice high-voltage indoor energy storage battery cabinet designed for data centers, commercial buildings, and other indoor scenarios. Dust-proof design with no exposed cables, 5-minute installation for 225kWh-level systems, and ≥8,000 cycle life.

Key Specifications at a Glance: 192.92kWh Capacity | 173.62kWh Usable | 614.4V | 12S | 157A | IP20 | Air Cooling

Key Features

  • Easy Maintenance: External communication module and remote screen enable battery status identification in 5 minutes.
  • High Flexibility: BMS auto-identification, up to 10 units parallel.
  • Easy Installation: 5-minute installation with quick-connect structure.
  • Better Heat Dissipation: Temperature difference reduced by 35%, temperature rise reduced by 32.12%.
  • Dust-Proof Design: No exposed cables for enhanced safety and aesthetics.

Specifications

Model BS09-192-R (EnerFlex-2.0)
Cell Type LiFePO₄
Configuration 3.2V 314Ah / 12S
Rated Voltage 614.4V
Voltage Range 537.6~691.2V
Rated Energy 192.92kWh
Usable Energy (90% DOD) 173.62kWh
Max Charge/Discharge Current 157A
Parallel Expansion Up to 10 units
Cycle Life ≥8,000 cycles (25°C, 0.5C, 90% DOD, 70% EOL)
Warranty 5+5 years
Design Life ≥15 years
Cumulative Discharge Energy 309.8MWh
Display HMI (optional)
Cooling Air Cooling
Installation Floor-standing
Dimensions (W×D×H) 1100×792×1974mm
Weight 1630kg
Protection Rating IP20
Communication CAN / RS485

Certifications & Safety

UN38.3 / MSDS / IEC62619 / CE / UL1973 / UL2054. Short-circuit, over-current, and over-temperature protection. Status indicator lights (green for running / red for alarm).

Applications

  • Data center backup power and commercial building energy storage
  • Indoor commercial and industrial peak shaving
  • Scenarios requiring high-density indoor deployment

Dawnice Bs09 192 R 192kW C&I LiFePO4 Energy Storage System - Commercial Application Scene

Dawnice Bs09 192 R 192kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice Bs09 192 R 192kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice Bs09 192 R 192kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice Bs09 192 R 192kW C&I LiFePO4 Energy Storage System - Close-up Detail of Components
Dawnice Bs09 192 R 192kW C&I LiFePO4 Energy Storage System - 225kWh Capacity Configuration Detail
Dawnice Bs09 192 R 192kW C&I LiFePO4 Energy Storage System - Certification and Safety Compliance

FAQ

Q: What are the indoor installation requirements?

A: Requires a well-ventilated, load-bearing equipment room or power distribution room.

Q: How many units can be paralleled?

A: Up to 10 units, capacity from 112kWh to 2MWh level.

Q: Is it noisy?

A: Air cooling design with low operating noise.

Q: Can an external monitoring screen be connected?

A: Supports optional HMI and remote monitoring.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.