Case Study: Dawnice 2.38MWh C&I Energy Storage Project in South Ostrobothnia, Finland

Project Overview

Field Detail
Completion Date 2026-06
Country / Region Europe
Industry / Application Industrial Park
System Type C&I
Battery Capacity 2.38MWh (1125kW)
Inverter / PCS 9× BS07-265-ES-X All-in-One

Ruibit Energy — Authorized Distributor of Dawnice Energy

Jiangxi Ruibit Intelligent Technology Co., Ltd. provides reliable battery energy storage system (BESS) solutions for residential, commercial and industrial customers worldwide. As an authorized distributor of the Dawnice brand, our business covers Europe, Africa, the Middle East and Asia.

📧 [email protected] | 💬 WhatsApp: +86 139 7925 6068 🌐 www.ruibitenergy.com | www.ruibitbess.com


Case Study

Commercial Battery Storage Projects

C&I BESS Projects

Project Brief

As Northern Europe accelerates its transition toward renewable energy, industrial and commercial sectors face the dual challenge of managing volatile electricity prices and ensuring grid resilience. In South Ostrobothnia, Finland, a groundbreaking Commercial & Industrial (C&I) energy storage project has successfully gone live. Featuring a cluster of 9 units of the Dawnice BS07-265-ES-X All-in-One Energy Storage System, this installation delivers a total capacity of 1,125 kW / 2,385 kWh (approx. 2.38MWh), setting a new benchmark for localized energy management in the Nordic climate.

Background

South Ostrobothnia (Etelä-Pohjanmaa), known for its entrepreneurial spirit and expanding green infrastructure, experiences distinct seasonal energy demands. With freezing winter temperatures dipping well below 0°C and intense summer daylight, C&I enterprises need an energy solution that is both incredibly robust and highly efficient.

The client required an outdoor energy storage solution capable of:

Peak Shaving & Load Shifting: Reducing high demand charges during peak industrial hours.

Climate Resilience: Operating flawlessly in harsh Nordic weather conditions.

Space Efficiency: Fitting a high-capacity system into a constrained outdoor footprint without compromising safety or ventilation.

Project Highlights

  1. Ultra-High Energy Density with 314Ah Cells

By utilizing industry-leading 314Ah high-capacity cells paired with advanced Cell-to-Pack (CTP) technology , Dawnice significantly improved the energy density of each cabinet. This allowed the project to reach a massive 2.38MWh total capacity while minimizing the physical footprint in the South Ostrobothnia facility.

  1. Zero-Gap, Space-Saving Layout

The installation landscape highlights one of the system’s best design features: Flexible & Space-Saving Deployment . Thanks to an innovative front-in/rear-out thermal design, the 9 cabinets can be aligned side-by-side with virtually zero gaps. The optimized airflow paths maintain thermal stability across the entire row, making the layout exceptionally clean and compact.

  1. Extreme Climate Adaptability (Down to -30°C)

Finland's winters are notoriously unforgiving. The BS07-265-ES-X is engineered with an Intelligent Air Cooling system and wide-temperature architecture that supports stable operations from -30°C to 55°C . Furthermore, the system utilizes PCS waste heat recovery to drastically reduce auxiliary cooling and heating energy consumption, ensuring high round-trip efficiency even in mid-winter.

  1. Multi-Layer Safety Assurance

Safety is paramount for C&I deployments. The Dawnice cabinets feature a robust dual fire suppression system , combining cluster-level aerosol with cabin-level water mist. Paired with an intelligent monitoring system that tracks real-time voltage and temperature, the facility is comprehensively protected against thermal runaway risks.

Request a quote for commercial battery storage. 100% certified, quick delivery.

Recommended for Your Business

HZEB-HCT-125TS/265  Integrated PV-Storage-Genset Hybrid System

HZEB-HCT-125CS/265 All-in-One C&I Energy Storage

BS09-112-D-P -112kWh Commercial Battery Storage

BS09-225-D-225 kWh DC Side Commercial Storage System

Case Study: Dawnice 2.38MWh C&I Energy Storage Project in South Ostrobothnia, Finland
Case Study: Dawnice 2.38MWh C&I Energy Storage Project in South Ostrobothnia, Finland
Case Study: Dawnice 2.38MWh C&I Energy Storage Project in South Ostrobothnia, Finland
Case Study: Dawnice 2.38MWh C&I Energy Storage Project in South Ostrobothnia, Finland

Related Case Studies

Explore more real-world BESS deployments from Ruibit Energy:


Ready to Find Your Perfect BESS Solution?

Contact Ruibit BESS for a free consultation and custom BESS solution tailored to your commercial and industrial energy storage needs.