Project Overview
Ruibit Energy — Authorized Distributor of Dawnice Energy
Jiangxi Ruibit Intelligent Technology Co., Ltd. provides reliable battery energy storage system (BESS) solutions for residential, commercial and industrial customers worldwide. As an authorized distributor of the Dawnice brand, our business covers Europe, Africa, the Middle East and Asia.
📧 [email protected] | 💬 WhatsApp: +86 139 7925 6068 🌐 www.ruibitenergy.com | www.ruibitbess.com
Case Study
Commercial Battery Storage Projects
C&I BESS Projects
Project Brief
Dawnice has successfully deployed and commissioned a 100kW/200kWh Commercial & Industrial (C&I) All-In-One Energy Storage System (ESS) in Switzerland
Powered by the Dawnice
HZEB-ESS100P-200
battery system
, the project is optimized for
Peak Shaving & Valley Filling
to smooth local grid loads
By intelligently mitigating peak demands and executing energy arbitrage
, the system directly minimizes premium capacity charges for the Swiss facility, delivering an estimated payback period of
6years
Background
Commercial entities in Switzerland operate within a highly dynamic energy market enforced with substantial time-of-use tariffs and stringent demand charges. When an industrial plant’s electricity usage peaks beyond set grid allowances, utilities levy heavily penalized capacity fees.
To mitigate these operational risks and manage escalating overheads, this Swiss industrial facility partnered with Dawnice
By implementing an all-in-one storage cabinet, the factory can now absorb low-cost grid energy during off-peak periods and discharge it when corporate production loads surge
, safely dampening peak curves.
Project Highlights
100kW/200kWh Smart Outdoor All-In-One Integration
The project utilizes a highly integrated Outdoor Cabinet design delivering a rated output of 100kW and a nominal capacity of 200.7kWh
Neatly encapsulating the storage inverter, premium battery arrays, a smart cooling system, and an intelligent EMS
, it delivers a high protection rating optimized for diverse European climates
Long-Lifecycle LiFePO4 Battery Engineering
The system is built on a 1P224S configuration featuring high-density 280Ah Lithium Iron Phosphate (LiFePO4) cells with a rated DC voltage of 716.8V
Delivering an exceptional cycle life of >
6000
cycles (@25°C, 0.5C, 90% DOD, 70% EOL) and backed by a 5+5 years warranty
, the project is engineered to achieve a lifetime cumulative discharge energy of 322.3MWh
Optimized Peak Shaving & Commercial Energy Arbitrage
Driven by state-of-the-art management controls, the system dynamically manages facility load curves
Beyond smoothing localized grid stresses via peak-shaving
, it enables automated energy arbitrage—charging when grid rates are low or solar is abundant, and discharging during peak utility pricing to unlock immediate cost relief
Modular Design Scalable for Up to 10 Units in Parallel
To align with future corporate expansion or scaling facility loads, the cabinet features built-in modular scalability
The advanced architecture allows for
up to 10 cabinets to be tied in parallel
, providing maximum flexibility for step-by-step energy capacity customization
Cloud Platform Management & Multi-State Proactive Tracking
The ESS features fast state-monitoring and comprehensive fault logging to enable proactive pre-alarms and rapid fault isolation
Coupled with the integrated Dawnice Cloud Platform for remote diagnostic analysis
, it maintains safe operational continuity across extreme ambient temperatures ranging from -30°C to 55°C
Related Case Studies
Explore more real-world BESS deployments from Ruibit Energy:
- Poland 112kWh C&I — 112kWh | Small C&I
- Estonia 600kWh — 600kWh | C&I
- Ireland 668kWh Mushroom — 668kWh | Agriculture/Food
- Vietnam 265kWh EV Charging — 265kWh | EV Charging