Dawnice BESS - Dawnice 100kW/215kWh Liquid-Cooled All-in-One C&I LiFePO4 Energy Storage - 100Kw 215Kwh Liquid Cooled All In O...

Dawnice 100kW/215kWh Liquid-Cooled All-in-One C&I LiFePO4 Energy Storage

Dawnice 100kW/215kWh liquid-cooled all-in-one energy storage system integrates LiFePO4 battery, 100kW PCS inverter, BMS, and liquid cooling in a compact cabinet for commercial & industrial applications. High-power output, efficient thermal management, and plug-and-play deployment for global C&I peak-shaving and solar projects.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The 100kW/215kWh Liquid-Cooled All-in-One Cabinet is a Dawnice liquid-cooled commercial and industrial energy storage system with integrated battery + PCS, liquid cooling, suitable for rapid deployment in small and medium commercial applications.

Key Specifications at a Glance: 100kW | 215kWh | Liquid Cooling | All-in-One | 5+5 Year Warranty

Key Features

  • Liquid-Cooled All-in-One: Battery + PCS integrated, plug-and-play.
  • Compact Footprint: Small volume with high capacity.
  • High-Efficiency Cooling: Liquid cooling thermal management.
  • Smart Management: EMS cloud O&M.

Specifications

Model 100kW/215kWh Liquid-Cooled All-in-One
Rated Power 100kW
Rated Energy 215kWh
Cooling Liquid Cooling
Cell LiFePO₄
Warranty 5+5 years
Certifications Per official Datasheet

Certifications & Safety

Liquid cooling + BMS protection.

Applications

  • Small and medium commercial energy storage
  • Shops / factories peak shaving

Dawnice 100Kw 215Kwh Liquid Cooled 100kW C&I LiFePO4 Energy Storage System - Main Product View

Dawnice 100Kw 215Kwh Liquid Cooled 100kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice 100Kw 215Kwh Liquid Cooled 100kW C&I LiFePO4 Energy Storage System - Official Internal Structure Diagram
Dawnice 100Kw 215Kwh Liquid Cooled 100kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice 100Kw 215Kwh Liquid Cooled 100kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice 100Kw 215Kwh Liquid Cooled 100kW C&I LiFePO4 Energy Storage System - Product Detail Image

FAQ

Q: Is it suitable for small commercial?

A: Yes, rapid deployment.

Q: Does it include PCS?

A: Yes, included.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.