Dawnice 1MW/2.089MWh 40GP Container C&I LiFePO4 Energy Storage System
The ESS1000-2089 is a Dawnice 1MW/2.089MWh containerized energy storage system (40GP) built with 314Ah LiFePO₄, 0.5C rate, and FM200/NOVEC1230 fire suppression for MW-level standard deployment.
Key Specifications at a Glance: 1000kW | 2.089MWh | 40GP | 665.6V/10P208S | IP54 / C5
Key Features
- MW-Level Capacity: 2.089MWh per cabinet.
- Grid-Tied/Off-Grid Switching: Flexible operating modes.
- Smart Thermal Management: Air cooling + BMS integrated management.
- Rapid Deployment: Standard 40GP container.
Specifications
| Model | ESS1000-2089 |
|---|---|
| Rated Power | 1000kW |
| Rated Voltage | 400V (AC 320–460V) |
| Rated Current | 1570A |
| Battery Configuration | 665.6V / 10P208S |
| Rated Energy | 2.089MWh |
| Cell | 3.2V / 314Ah |
| Max Charge/Discharge Rate | 0.5C@25°C |
| Cycle Life | ≥8,000 |
| Container | 40GP |
| Net Weight | 38,000kg |
| Protection | IP54, C5 |
| Fire Suppression | FM200 / NOVEC1230 |
| Operating Temperature | 0~+45°C |
| Communication | RS485 / TCP/IP |
Certifications & Safety
FM200/NOVEC1230 fire suppression. Electrical compartment / battery compartment thermal isolation.
Applications
- Large independent energy storage stations
- Grid-side peak shaving and frequency regulation
FAQ
Q: What transport method?
A: Standard 40GP container.
Q: Can it be paralleled?
A: Supports multi-unit parallel.
Q: Does it include PCS?
A: Includes 1MW PCS and isolation transformer.
Order & Support
For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.
Applications
Factory & Industrial Parks
Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.
Commercial Buildings & Data Centers
Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.
EV Charging Stations
Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.
Residential & Community
Store solar energy for self-consumption; provide backup power during outages and lower utility bills.
Remote & Off-Grid Microgrids
Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.
Renewable Energy Integration
Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.