Dawnice BESS - Dawnice 1MW/2.089MWh 40GP Container C&I LiFePO4 Energy Storage System - Ess1000 2089 1Mw 2.089Mwh Container Es...

Dawnice 1MW/2.089MWh 40GP Container C&I LiFePO4 Energy Storage System

Dawnice ESS1000-2089 1MW/2.089MWh container energy storage system delivers high-capacity LiFePO4 battery storage in a standard 40GP container for commercial & industrial applications. Integrated PCS, BMS, and thermal management enable rapid deployment, high-efficiency operation, and scalable capacity for global utility-scale and C&I energy projects.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The ESS1000-2089 is a Dawnice 1MW/2.089MWh containerized energy storage system (40GP) built with 314Ah LiFePO₄, 0.5C rate, and FM200/NOVEC1230 fire suppression for MW-level standard deployment.

Key Specifications at a Glance: 1000kW | 2.089MWh | 40GP | 665.6V/10P208S | IP54 / C5

Key Features

  • MW-Level Capacity: 2.089MWh per cabinet.
  • Grid-Tied/Off-Grid Switching: Flexible operating modes.
  • Smart Thermal Management: Air cooling + BMS integrated management.
  • Rapid Deployment: Standard 40GP container.

Specifications

Model ESS1000-2089
Rated Power 1000kW
Rated Voltage 400V (AC 320–460V)
Rated Current 1570A
Battery Configuration 665.6V / 10P208S
Rated Energy 2.089MWh
Cell 3.2V / 314Ah
Max Charge/Discharge Rate 0.5C@25°C
Cycle Life ≥8,000
Container 40GP
Net Weight 38,000kg
Protection IP54, C5
Fire Suppression FM200 / NOVEC1230
Operating Temperature 0~+45°C
Communication RS485 / TCP/IP

Certifications & Safety

FM200/NOVEC1230 fire suppression. Electrical compartment / battery compartment thermal isolation.

Applications

  • Large independent energy storage stations
  • Grid-side peak shaving and frequency regulation

Dawnice Ess1000 2089 1MW C&I LiFePO4 Energy Storage System - Main Product View

Dawnice Ess1000 2089 1MW C&I LiFePO4 Energy Storage System - Commercial Application Scene
Dawnice Ess1000 2089 1MW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice Ess1000 2089 1MW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice Ess1000 2089 1MW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice Ess1000 2089 1MW C&I LiFePO4 Energy Storage System - Product Detail Image

FAQ

Q: What transport method?

A: Standard 40GP container.

Q: Can it be paralleled?

A: Supports multi-unit parallel.

Q: Does it include PCS?

A: Includes 1MW PCS and isolation transformer.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.