Dawnice BESS - Dawnice 200kWh Commercial C&I LiFePO4 Battery Energy Storage System - Hzeb Ess100P 200 200Kwh Commercial Batte...

Dawnice 200kWh Commercial C&I LiFePO4 Battery Energy Storage System

Dawnice HZEB-ESS100P-200 200kWh commercial battery storage system delivers reliable LiFePO4 energy storage for commercial & industrial applications. Compact design with integrated BMS and PCS enables easy installation, peak-shaving, demand management, and backup power for global C&I users seeking to reduce electricity costs and enhance power reliability.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The HZEB-ESS100P-200 is a Dawnice 200kWh commercial battery storage system with modular parallel connection and flexible expansion, suitable for park-level co-located storage and peak shaving.

Key Specifications at a Glance: 200kWh Capacity | Modular Parallel | Commercial-Grade | 5+5 Year Warranty

Key Features

  • Modular Design: Flexible expansion, configured on demand.
  • High Safety: LiFePO₄ + BMS multi-layer protection.
  • Commercial-Grade Protection: Adapted for indoor and outdoor deployment.
  • Smart Monitoring: EMS remote management.

Specifications

Model HZEB-ESS100P-200
Cell Type LiFePO₄
Rated Energy 200kWh
System Modular Parallel
Warranty 5+5 years
Certifications UN38.3 / IEC62619 / CE (per official Datasheet)

Certifications & Safety

BMS protection + fire suppression (per configuration). UN38.3 / IEC62619 / CE.

Applications

  • Commercial and industrial park peak shaving
  • Solar + storage and demand management

Dawnice Hzeb Ess100P 200 200kW C&I LiFePO4 Energy Storage System - Main Product View

Dawnice Hzeb Ess100P 200 200kW C&I LiFePO4 Energy Storage System - Commercial Application Scene
Dawnice Hzeb Ess100P 200 200kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice Hzeb Ess100P 200 200kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice Hzeb Ess100P 200 200kW C&I LiFePO4 Energy Storage System - Product Detail Image

FAQ

Q: Can it be paralleled for expansion?

A: Supports modular parallel connection.

Q: Which PCS are compatible?

A: Compatible with mainstream PCS.

Q: What is the warranty?

A: 5+5 years.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.