Dawnice BESS - Dawnice DBS-ESD-1000P-200 1MW/2MWh Container C&I LiFePO4 Energy Storage - Dbs Esd 1000P 200 1Mw 2Mwh Container...

Dawnice DBS-ESD-1000P-200 1MW/2MWh Container C&I LiFePO4 Energy Storage

Dawnice DBS-ESD-1000P-200 1MW/2MWh container energy storage system delivers high-capacity LiFePO4 battery storage in a standard shipping container for commercial & industrial applications. Integrated PCS, BMS, and thermal management enable rapid outdoor deployment, high-efficiency operation, and scalable capacity for global utility-scale and C&I energy projects.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The DBS-ESD-1000P-200 is a Dawnice 1MW/2MWh wind-solar-storage integrated container energy storage system designed for large wind/solar power stations and independent energy storage stations.

Key Specifications at a Glance: 1000kW | 2000kWh | 40GP-Class | Wind-Solar-Storage Integrated | 5+5 Year Warranty

Key Features

  • Wind-Solar-Storage Integrated: Renewable energy co-located storage for smooth output.
  • Large Capacity: 2MWh-level per system.
  • Standard Container: Rapid deployment, global logistics.
  • Smart EMS: Grid scheduling and cloud management.

Specifications

Model DBS-ESD-1000P-200
Rated Power 1000kW
Rated Energy 2000kWh
Cell Type LiFePO₄
Container 40GP-Class
Warranty 5+5 years
Certifications UN38.3 / IEC62619 / CE / UL (per official Datasheet)

Certifications & Safety

Fire suppression + BMS protection. Full certifications.

Applications

  • Wind/solar power station co-located storage
  • Independent energy storage stations, grid-side peak shaving

Dawnice DBS-ESD-1000P-200 1MW C&I LiFePO4 Energy Storage System - Commercial Application Scene

Dawnice DBS-ESD-1000P-200 1MW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice DBS-ESD-1000P-200 1MW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice DBS-ESD-1000P-200 1MW C&I LiFePO4 Energy Storage System - Product Detail Image

FAQ

Q: Is it suitable for wind/solar stations?

A: Yes, wind-solar-storage integrated.

Q: Can it be paralleled?

A: Supports multi-unit parallel to hundreds of MWh level.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.