Dawnice DBS-ESD-1000P-200 1MW/2MWh Container C&I LiFePO4 Energy Storage
The DBS-ESD-1000P-200 is a Dawnice 1MW/2MWh wind-solar-storage integrated container energy storage system designed for large wind/solar power stations and independent energy storage stations.
Key Specifications at a Glance: 1000kW | 2000kWh | 40GP-Class | Wind-Solar-Storage Integrated | 5+5 Year Warranty
Key Features
- Wind-Solar-Storage Integrated: Renewable energy co-located storage for smooth output.
- Large Capacity: 2MWh-level per system.
- Standard Container: Rapid deployment, global logistics.
- Smart EMS: Grid scheduling and cloud management.
Specifications
| Model | DBS-ESD-1000P-200 |
|---|---|
| Rated Power | 1000kW |
| Rated Energy | 2000kWh |
| Cell Type | LiFePO₄ |
| Container | 40GP-Class |
| Warranty | 5+5 years |
| Certifications | UN38.3 / IEC62619 / CE / UL (per official Datasheet) |
Certifications & Safety
Fire suppression + BMS protection. Full certifications.
Applications
- Wind/solar power station co-located storage
- Independent energy storage stations, grid-side peak shaving
FAQ
Q: Is it suitable for wind/solar stations?
A: Yes, wind-solar-storage integrated.
Q: Can it be paralleled?
A: Supports multi-unit parallel to hundreds of MWh level.
Order & Support
For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.
Applications
Factory & Industrial Parks
Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.
Commercial Buildings & Data Centers
Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.
EV Charging Stations
Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.
Residential & Community
Store solar energy for self-consumption; provide backup power during outages and lower utility bills.
Remote & Off-Grid Microgrids
Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.
Renewable Energy Integration
Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.