Dawnice BESS - Dawnice 30-70kW Three-Phase C&I Hybrid Inverter for Solar Energy Storage - Dwh 30~70K Three Phase Candi Hybrid...

Dawnice 30-70kW Three-Phase C&I Hybrid Inverter for Solar Energy Storage

Dawnice DWH-30~70K 30-70kW three-phase C&I hybrid inverter integrates solar PV, battery storage, and grid connection in one unit for commercial & industrial applications. Supports on-grid, off-grid, and backup modes, enabling maximum solar self-consumption, peak-shaving, and reliable power supply for global C&I solar energy storage projects.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The DWH-29.9~60K-HP3EU-S / DWH-30~70K-HP3US-S is a Dawnice three-phase commercial and industrial hybrid inverter (30–70kW). Featuring 4 MPPT trackers, 100% three-phase unbalanced output, dual battery input (100A×2), IP66 protection, and support for 8-unit parallel and AC Coupling retrofits.

Key Specifications at a Glance: 30–70kW | 4 MPPT | 100% Three-Phase Unbalanced | Dual Battery 200A | IP66 | 8 Units Parallel

Key Features

  • Excellent Performance & Efficiency: 100% three-phase unbalanced output, 99.9% MPPT efficiency, 1.67X PV oversizing.
  • Smart Energy Management: Integrated local/remote EMS, diesel generator support, open API.
  • High Safety & Reliability: Full SiC technology, IP66 protection, plug-and-play.
  • Flexible Expansion: Up to 8 units parallel, supports AC Coupling.
  • Dual Battery Input: Dual independent battery inputs, 100A each, max 200A parallel.

Specifications

Model DWH-30K (example)
Rated Power 30–70kW (model dependent)
Rated Voltage 380/400V, 3W+N+PE (EU); 120/208V, 277/480V (US)
Frequency 50/60Hz
Power Factor 0.8 leading~0.8 lagging
MPPT 4 channels (2+2+2+2)
Max PV Input 2X oversizing, up to 100kW
Max DC Voltage 1000V
MPPT Voltage Range 150~850V
Battery Voltage Range 135~850V
Charge/Discharge Current 2×100A (max 200A parallel)
Parallel Up to 8 units
Protection IP66
Noise <65dB
Warranty 5 years
Dimensions (W×H×D) 544×880×278mm (EU) / 544×953×278mm (US)
Weight 88–90kg
Display App+LED / LCD (-S version)
Communication RS485 / WiFi / CAN / DRM (Bluetooth/LAN/meter optional)

Certifications & Safety

EU: IEC62109-1/2, IEC62477-1, EN50549-1&-10, NRS097-2-1. US: UL1741, UL1547, UL1998, UL1699B, FCC Part 15B, CEC. Ground fault / residual current / RCD detection.

Applications

  • Commercial and industrial solar + storage power stations
  • Microgrids and diesel-solar-storage hybrid systems
  • Scenarios requiring three-phase unbalanced load

Dawnice Dwh 30 70K 70kW C&I LiFePO4 Energy Storage System - Commercial Application Scene

Dawnice Dwh 30 70K 70kW C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice Dwh 30 70K 70kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice Dwh 30 70K 70kW C&I LiFePO4 Energy Storage System - Product Detail Image

FAQ

Q: Can it handle three-phase unbalanced loads?

A: Yes, supports 100% three-phase unbalanced output.

Q: How large can it be paralleled?

A: Up to 8 units parallel.

Q: Which batteries are compatible?

A: Compatible with mainstream high-voltage lithium batteries (135–850V), supports dual battery input.

Q: What certifications do US models have?

A: UL1741, UL1547, CEC, and more.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.