Empowering Education: Dawnice 75kW/215kWh Solar Storage & EV Charging Project at Abuja University (March 2026)

Project Overview

Field Detail
Completion Date 2026-03
Country / Region Africa
Industry / Application University / Education + EV Charging
System Type C&I / Education
Battery Capacity 75kW / 215kWh + 60kW EV
Inverter / PCS 75kW PCS

Ruibit Energy — Authorized Distributor of Dawnice Energy

Jiangxi Ruibit Intelligent Technology Co., Ltd. provides reliable battery energy storage system (BESS) solutions for residential, commercial and industrial customers worldwide. As an authorized distributor of the Dawnice brand, our business covers Europe, Africa, the Middle East and Asia.

📧 [email protected] | 💬 WhatsApp: +86 139 7925 6068 🌐 www.ruibitenergy.com | www.ruibitbess.com

Empowering Education: Dawnice 75kW/215kWh Solar Storage & EV Charging Project at Abuja University (March 2026)

Case Study

Commercial Battery Storage Projects

C&I BESS Projects

Project Brief

In a landmark move toward campus sustainability, Abuja University in Nigeria has successfully commissioned a cutting-edge integrated energy solution. Powered by Dawnice, this project combines a high-capacity 75kW/215kWh Energy Storage System (ESS) with a 60kW EV Fast Charging station. This "Solar-Storage-Charging" microgrid provides the university with a reliable, 24/7 green power supply, significantly reducing its carbon footprint and reliance on the unstable local grid.

Background

Educational institutions in Nigeria frequently face challenges with grid instability and high diesel generator costs . Abuja University required a robust solution to:

Ensure uninterrupted power for critical research laboratories and lecture halls.

Lower operational expenditures (OPEX) by transitioning from diesel to solar.

Pioneer green transportation infrastructure by providing high-speed EV charging for faculty and visitors.

Project Highlights

High-Density Energy Storage (215kWh): Utilizing premium LiFePO4 (LFP) technology, the system stores excess solar energy during the day to power the campus at night or during grid outages, ensuring "zero-flicker" transitions for sensitive equipment.

Powerful Output (75kW PCS): The 75kW Power Conversion System (PCS) handles high-surge industrial loads, making it ideal for the university’s diverse energy demands, from lighting to heavy lab machinery.

Integrated 60kW EV Fast Charger: Unlike standard slow-chargers, the integrated 60kW DC Fast Charger allows electric vehicles to reach significant charge levels in under an hour, directly utilizing the stored solar energy.

All-Weather Reliability: Specifically engineered for the Nigerian climate, the Dawnice system features advanced thermal management to maintain peak efficiency even in high-temperature environments.

Smart Energy Management: Equipped with remote monitoring, university facility managers can track real-time energy production, storage levels, and EV charging stats via a mobile or desktop dashboard.

Recommended for Your Business

HZEB-HCT-125TS/265  Integrated PV-Storage-Genset Hybrid System

HZEB-HCT-125CS/265 All-in-One C&I Energy Storage

BS09-112-D-P -112kWh Commercial Battery Storage

BS09-225-D-225 kWh DC Side Commercial Storage System

Related Case Studies

Explore more real-world BESS deployments from Ruibit Energy:


Ready to Find Your Perfect BESS Solution?

Contact Ruibit BESS for a free consultation and custom BESS solution tailored to your commercial and industrial energy storage needs.