Dawnice BESS - Dawnice High-Rate HV Rack C&I LiFePO4 Battery Energy Storage System - High Rate Hv Rack Battery 2

Dawnice High-Rate HV Rack C&I LiFePO4 Battery Energy Storage System

Dawnice High-Rate HV Rack Battery delivers high-voltage, high-power LiFePO4 energy storage in a compact rack-mounted design. Ideal for commercial & industrial applications requiring rapid charge/discharge and scalable capacity.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The High-Rate HV Rack Battery is a Dawnice high-rate rack-mounted battery designed for high-power applications, supporting fast charge and discharge for frequency regulation, fast charging, and other scenarios.

Key Specifications at a Glance: High-Rate | HV Rack | Fast Charge/Discharge | DC Side

Key Features

  • High-Rate Charge/Discharge: Adapted for frequency regulation / fast charging scenarios.
  • High-Voltage Rack: Standard cabinet deployment.
  • Modular: Flexible expansion.
  • BMS Protection: Real-time monitoring.

Specifications

Model High-Rate HV Rack
Cell LiFePO₄
System High-Voltage Rack
Feature High-Rate Charge/Discharge
Warranty 5+5 years
Certifications Per official Datasheet

Certifications & Safety

BMS protection.

Applications

  • Frequency regulation energy storage, fast charging co-located storage
  • Data center backup power
Dawnice High Rate Hv Rack Battery  C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice High Rate Hv Rack Battery  C&I LiFePO4 Energy Storage System - Product Detail Image
Dawnice High Rate Hv Rack Battery  C&I LiFePO4 Energy Storage System - Certification and Safety Compliance
Dawnice High Rate Hv Rack Battery  C&I LiFePO4 Energy Storage System - Close-up Detail of Components
Dawnice High Rate Hv Rack Battery  C&I LiFePO4 Energy Storage System - 225kWh Capacity Configuration Detail
Dawnice High Rate Hv Rack Battery  C&I LiFePO4 Energy Storage System - Product Detail Image

FAQ

Q: What is high-rate suitable for?

A: Suitable for power-type applications such as frequency regulation.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.