Dawnice Honey 260kWh Liquid-Cooled All-in-One C&I LiFePO4 Energy Storage
The Honey WD-ECF260S is a Dawnice 260kWh liquid-cooled all-in-one commercial and industrial energy storage cabinet. Liquid cooling delivers superior temperature uniformity and longer cycle life, suitable for high-power-density commercial and industrial deployment.
Key Specifications at a Glance: 260kWh Capacity | Liquid Cooling | All-in-One Design | 5+5 Year Warranty
Key Features
- High-Efficiency Liquid Cooling: Superior temperature uniformity compared to air cooling, extending battery life.
- All-in-One Design: Battery + PCS + EMS integrated for plug-and-play deployment.
- High Energy Density: Higher capacity in the same footprint.
- Smart Management: EMS real-time monitoring and cloud-based O&M.
Specifications
| Model | Honey WD-ECF260S |
|---|---|
| Cell Type | LiFePO₄ |
| Rated Energy | 260kWh |
| Cooling | Liquid Cooling |
| Integration | Battery + PCS + EMS |
| Warranty | 5+5 years |
| Certifications | UN38.3 / IEC62619 / CE (per official Datasheet) |
| Protection Rating | Outdoor-grade (IP54 level) |
Certifications & Safety
Liquid cooling thermal management + BMS multi-layer protection. Module-level fire suppression (per Datasheet). Certified to UN38.3 / IEC62619 / CE / UL series.
Applications
- Commercial and industrial park energy storage and factory peak shaving
- Charging station / data center co-located storage
- High-density indoor and outdoor deployment
FAQ
Q: What are the advantages of liquid cooling over air cooling?
A: Smaller temperature difference, longer life, smaller footprint, and lower noise.
Q: Can capacity be expanded?
A: Supports multi-cabinet parallel connection.
Q: Can it be installed outdoors?
A: Yes, suitable for outdoor installation with high protection rating.
Q: What is the PCS power?
A: PCS is configured per project (see Datasheet for details).
Order & Support
For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.
Applications
Factory & Industrial Parks
Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.
Commercial Buildings & Data Centers
Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.
EV Charging Stations
Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.
Residential & Community
Store solar energy for self-consumption; provide backup power during outages and lower utility bills.
Remote & Off-Grid Microgrids
Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.
Renewable Energy Integration
Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.