Dawnice BESS - Dawnice 125kW/522kWh Liquid-Cooled Cabinet C&I LiFePO4 Energy Storage - Hzeb Hct 125 522 125Kw 522Kwh Liquid C...

Dawnice 125kW/522kWh Liquid-Cooled Cabinet C&I LiFePO4 Energy Storage

Dawnice HZEB-HCT-125/522 125kW/522kWh liquid-cooled cabinet energy storage system delivers high-power LiFePO4 battery storage with integrated liquid cooling for commercial & industrial applications. 125kW PCS inverter enables fast charge/discharge, while liquid cooling ensures uniform temperature and extended cycle life for global C&I peak-shaving and solar projects.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The HZEB-HCT-125/522 is a Dawnice 125kW/522kWh liquid-cooled commercial and industrial energy storage cabinet with liquid cooling and high energy density, designed for medium to large capacity commercial deployment.

Key Specifications at a Glance: 125kW | 522kWh | Liquid Cooling | Commercial-Grade | 5+5 Year Warranty

Key Features

  • Liquid-Cooled High Efficiency: Uniform temperature control for longer life.
  • Large Capacity High Density: 522kWh per cabinet, saving footprint.
  • Integrated Deployment: Battery + PCS integrated for rapid grid connection.
  • Smart EMS: Cloud monitoring and O&M.

Specifications

Model HZEB-HCT-125/522
Rated Power 125kW
Rated Energy 522kWh
Cooling Liquid Cooling
Cell Type LiFePO₄
Warranty 5+5 years
Certifications UN38.3 / IEC62619 / CE (per official Datasheet)

Certifications & Safety

Liquid cooling thermal management + BMS protection. Full certifications.

Applications

  • Medium commercial energy storage
  • Charging stations, park co-located storage

Dawnice Hzeb Hct 125 522 125kW C&I LiFePO4 Energy Storage System - Main Product View

Dawnice Hzeb Hct 125 522 125kW C&I LiFePO4 Energy Storage System - Commercial Application Scene
Dawnice Hzeb Hct 125 522 125kW C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice Hzeb Hct 125 522 125kW C&I LiFePO4 Energy Storage System - Official Internal Structure Diagram
Dawnice Hzeb Hct 125 522 125kW C&I LiFePO4 Energy Storage System - Front Angle Product Photography

FAQ

Q: What are the advantages of liquid cooling?

A: Smaller temperature difference, longer life, lower noise.

Q: Can it be installed outdoors?

A: Yes, suitable for outdoor installation.

Q: Does it include PCS?

A: Included per configuration.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.