Dawnice BESS - Dawnice HZEB-HCT HV Rack-Mounted C&I LiFePO4 Energy Storage Battery - Hzeb Hct Simple Rack Hv Rack Mounted Bat...

Dawnice HZEB-HCT HV Rack-Mounted C&I LiFePO4 Energy Storage Battery

Dawnice HZEB-HCT Simple Rack HV rack-mounted battery delivers high-voltage LiFePO4 energy storage in a compact 19-inch rack design for commercial & industrial applications. Modular rack-mount form factor enables easy installation, flexible capacity expansion, and seamless integration with existing UPS and power systems for global C&I projects.
6,000–8,000+ Cycles
LiFePO₄ Safety
CE / UL / IEC Certified
Smart EMS
Global Delivery
10yr / 5+5yr Warranty
Price shown is a reference for a standard configuration (FOB, without installation). Final quotation depends on capacity, PCS, cooling, shipping and project terms.

The HZEB-HCT Simple Rack is a Dawnice high-voltage rack-mounted battery with modular rack design and flexible expansion, suitable for commercial scenarios requiring rack deployment.

Key Specifications at a Glance: High-Voltage Rack | Modular | Flexible Expansion | DC Side

Key Features

  • Standard Rack Deployment: Standard cabinet installation, space-saving.
  • Modular Expansion: Add battery modules on demand.
  • High Voltage High Efficiency: High-voltage topology for lower line losses.
  • BMS Smart Management: Real-time monitoring of each cluster status.

Specifications

Model HZEB-HCT Simple Rack
Cell Type LiFePO₄
System High-Voltage Rack-Mounted
Expansion Modular
Warranty 5+5 years
Certifications UN38.3 / IEC62619 / CE (per official Datasheet)

Certifications & Safety

BMS protection. Full certifications.

Applications

  • Data center backup power
  • Commercial and industrial rack deployment

Dawnice Hzeb Hct Simple Rack  C&I LiFePO4 Energy Storage System - Main Product View

Dawnice Hzeb Hct Simple Rack  C&I LiFePO4 Energy Storage System - Internal Structure and Components
Dawnice Hzeb Hct Simple Rack  C&I LiFePO4 Energy Storage System - Close-up Detail of Components
Dawnice Hzeb Hct Simple Rack  C&I LiFePO4 Energy Storage System - 225kWh Capacity Configuration Detail
Dawnice Hzeb Hct Simple Rack  C&I LiFePO4 Energy Storage System - Certification and Safety Compliance

FAQ

Q: What cabinet standard?

A: Compatible with standard 19-inch racks.

Q: How large can it expand?

A: Modular on demand.

Order & Support

For BOM quotations and bulk pricing, please contact us. DDP/FOB/EXW trade terms available with export-grade reinforced wooden crating. Authorized Distributor of Dawnice.

Applications

Factory & Industrial Parks

Reduce electricity costs through peak shaving and TOU arbitrage; protect production from grid outages.

Commercial Buildings & Data Centers

Reliable backup power for zero downtime; optimize demand charges and improve energy efficiency.

EV Charging Stations

Add storage capacity to avoid costly grid upgrades; capture peak-valley arbitrage at charging sites.

Residential & Community

Store solar energy for self-consumption; provide backup power during outages and lower utility bills.

Remote & Off-Grid Microgrids

Stable off-grid power for mines, oilfields, and remote areas; reduce diesel dependency and operating costs.

Renewable Energy Integration

Seamlessly integrate with solar and wind systems; smooth output fluctuations and maximize renewable self-consumption.