Case Study: Optimizing Commercial Energy Efficiency with Dawnice 100kW/200kWh Peak Shaving ESS in Switzerland (May 2026)

Project Overview

Field Detail
Completion Date 2026-05
Country / Region Europe
Industry / Application Industrial Peak Shaving
System Type C&I
Battery Capacity 100kW / 200kWh
Inverter / PCS HZEB-ESS100P-200 All-in-One

Ruibit Energy — Authorized Distributor of Dawnice Energy

Jiangxi Ruibit Intelligent Technology Co., Ltd. provides reliable battery energy storage system (BESS) solutions for residential, commercial and industrial customers worldwide. As an authorized distributor of the Dawnice brand, our business covers Europe, Africa, the Middle East and Asia.

📧 [email protected] | 💬 WhatsApp: +86 139 7925 6068 🌐 www.ruibitenergy.com | www.ruibitbess.com

Case Study

Commercial Battery Storage Projects

C&I BESS Projects

Project Brief

Dawnice has successfully deployed and commissioned a 100kW/200kWh Commercial & Industrial (C&I) All-In-One Energy Storage System (ESS) in Switzerland

Powered by the Dawnice

HZEB-ESS100P-200

battery system

, the project is optimized for

Peak Shaving & Valley Filling

to smooth local grid loads

By intelligently mitigating peak demands and executing energy arbitrage

, the system directly minimizes premium capacity charges for the Swiss facility, delivering an estimated payback period of

6years

Case Study: Optimizing Commercial Energy Efficiency with Dawnice 100kW/200kWh Peak Shaving ESS in Switzerland (May 2026)

Background

Commercial entities in Switzerland operate within a highly dynamic energy market enforced with substantial time-of-use tariffs and stringent demand charges. When an industrial plant’s electricity usage peaks beyond set grid allowances, utilities levy heavily penalized capacity fees.

To mitigate these operational risks and manage escalating overheads, this Swiss industrial facility partnered with Dawnice

By implementing an all-in-one storage cabinet, the factory can now absorb low-cost grid energy during off-peak periods and discharge it when corporate production loads surge

, safely dampening peak curves.

Project Highlights

100kW/200kWh Smart Outdoor All-In-One Integration

The project utilizes a highly integrated outdoor cabinet design delivering a rated output of 100kW and a nominal capacity of 200.7kWh

Neatly encapsulating the storage inverter, premium battery arrays, a smart cooling system, and an intelligent EMS

, it delivers a high protection rating optimized for diverse European climates

Long-Lifecycle LiFePO4 Battery Engineering

The system is built on a 1P224S configuration featuring high-density 280Ah Lithium Iron Phosphate (LiFePO4) cells with a rated DC voltage of 716.8V

Delivering an exceptional cycle life of >

6000

cycles (@25°C, 0.5C, 90% DOD, 70% EOL) and backed by a 5+5 years warranty

, the project is engineered to achieve a lifetime cumulative discharge energy of 322.3MWh

Optimized Peak Shaving & Commercial Energy Arbitrage

Driven by state-of-the-art management controls, the system dynamically manages facility load curves

Beyond smoothing localized grid stresses via peak-shaving

, it enables automated energy arbitrage—charging when grid rates are low or solar is abundant, and discharging during peak utility pricing to unlock immediate cost relief

Modular Design Scalable for Up to 10 Units in Parallel

To align with future corporate expansion or scaling facility loads, the cabinet features built-in modular scalability

The advanced architecture allows for

up to 10 cabinets to be tied in parallel

, providing maximum flexibility for step-by-step energy capacity customization

Cloud Platform Management & Multi-State Proactive Tracking

The ESS features fast state-monitoring and comprehensive fault logging to enable proactive pre-alarms and rapid fault isolation

Coupled with the integrated Dawnice Cloud Platform for remote diagnostic analysis

, it maintains safe operational continuity across extreme ambient temperatures ranging from -30°C to 55°C

Case Study: Optimizing Commercial Energy Efficiency with Dawnice 100kW/200kWh Peak Shaving ESS in Switzerland (May 2026)

Related Case Studies

Explore more real-world BESS deployments from Ruibit Energy:


Ready to Find Your Perfect BESS Solution?

Contact Ruibit BESS for a free consultation and custom BESS solution tailored to your commercial and industrial energy storage needs.