Dawnice Deploys 668kWh Energy Storage System at Irish Mushroom Factory

Project Overview

Field Detail
Completion Date 2026-01
Country / Region Europe
Industry / Application Food Processing / Agriculture
System Type C&I / Agriculture
Battery Capacity 668kWh
Inverter / PCS Smart EMS

Ruibit Energy — Authorized Distributor of Dawnice Energy

Jiangxi Ruibit Intelligent Technology Co., Ltd. provides reliable battery energy storage system (BESS) solutions for residential, commercial and industrial customers worldwide. As an authorized distributor of the Dawnice brand, our business covers Europe, Africa, the Middle East and Asia.

📧 [email protected] | 💬 WhatsApp: +86 139 7925 6068 🌐 www.ruibitenergy.com | www.ruibitbess.com

Case Study

Commercial Battery Storage Projects

C&I BESS Projects

Project Brief

We successfully installed and commissioned a 668kWh solar-powered energy storage system at a mushroom factory in Ireland. This system delivers clean, stable, and efficient electricity to support the facility’s continuous production needs.

Background

Mushroom cultivation is a highly energy-intensive process, requiring stable 24/7 power for climate control, lighting, and automated operations. Rising electricity costs and sustainability goals pushed the factory to seek a reliable, low-carbon energy solution. Dawnice designed a tailored storage system to help the customer achieve energy independence and long-term cost optimization.

Project Highlights

668kWh High-Capacity Energy Storage System

Meets the factory’s continuous power demand and supports round-the-clock operation.

Ideal for Agriculture & Food Processing

Designed to serve energy-intensive industries with stable and reliable power output.

Smart EMS Integration

Enables remote monitoring, intelligent energy dispatch, and cost optimization.

On-Site Deployment in Ireland

Real-world installation and operation, documented with on-site footage.

Dawnice continues to empower the global energy transition by delivering highly reliable and intelligent energy storage solutions across agriculture, manufacturing, and commercial sectors.

Recommended for Your Business

HZEB-HCT-125TS/265  Integrated PV-Storage-Genset Hybrid System

HZEB-HCT-125CS/265 All-in-One C&I Energy Storage

BS09-112-D-P -112kWh Commercial Battery Storage

BS09-225-D-225 kWh DC Side Commercial Storage System

Dawnice Deploys 668kWh Energy Storage System at Irish Mushroom Factory
Dawnice Deploys 668kWh Energy Storage System at Irish Mushroom Factory
Dawnice Deploys 668kWh Energy Storage System at Irish Mushroom Factory
Dawnice Deploys 668kWh Energy Storage System at Irish Mushroom Factory

Related Case Studies

Explore more real-world BESS deployments from Ruibit Energy:


Ready to Find Your Perfect BESS Solution?

Contact Ruibit BESS for a free consultation and custom BESS solution tailored to your commercial and industrial energy storage needs.